Ethanol Extraction Requirements in the City of Los Angeles (LAFD, DCR, Cal-OSHA, & CDPH)

RE: Ethanol Extraction in the City of Los Angeles

Hi Group,

I was thinking about setting up the framework to do ethanol extraction in Los Angeles. I already possess a Type 6 Infusion license.

The facility is about 60X22
2 of the four walls are Cinder Block
No Sprinkler System
The ceiling is exposed-insulation covered with a radion barrier.

Is the only difference between C1D1 and C1D2 is how you use it?
Does the amount of ethanol in use have any bearing? It is an open-loop system (tea bags-Pinnacle System)
Any guesses on retrofitting costs?
Is it a good idea to use modular vs. build-out?

Thanks, Folks