Any suggestions for set up

Good evening
So I didnt like the set up I bought which had the crc stack attached to the material column with a welded between the two then the ball valve then collection. I wanted it seperated because on other larger or rack systems the CRC is a seperate unit.
Anyways I orderd some parts and rigged this up so now it will go material/dewax column to welded disc with tampon tek to ball valve to this CRC stack with another welded with more tampon tek and O ring to avoid anal leakage in the pot…
Just wondering if anybody had any thoughts or input if they have the time.
Im new to CrC and like that I know have a way to drain material column if all else fails…
I got material to lose not Solvent and time as I try and fine tune…
I have got it fairly sorted now …
Thanks in Advance sorry for the novel

Its a 2.5 lb or a 5 … two columns but it so tall so until I rack it I run 2.5 then just change out columns and go again without emptying pot .
Still sorting it all out

I like how I can hit the crc with solvent and just collect it back then revac collection and crc prior to run …